India’s strive to be “atmanirbhar” in engines is not a story of 2026. In 1986, the government had tasked DRDO’s Gas Turbine Research Establishment (GTRE) with building the indigenous Kaveri engine to power the then-nascent Tejas light combat aircraft. What followed was four decades of heartbreak. Despite nine prototype engines, over 3,200 hours of testing, and a budget overrun of 642 per cent, the Kaveri produced only 70.4 kilonewtons (kN) of wet thrust against a required 81 kilonewtons.
Related Posts
‘It was a complete lie’: Babar refused Pathan interview? Here’s what happened
Former India all-rounder Irfan Pathan recalled how fake news spread during the 2023 ODI World Cup after a Pakistani media…
‘Silver missing, Rs 80 lakh recovered’: 8 in judicial custody over Ram Mandir donation fraud
Eight individuals arrested in connection with alleged donation theft at the Ayodhya Ram temple have been remanded to judicial custody…